INDEX TO

 DEVELOPER SPECIFICATIONS

DRAWINGS

(Acrobat Reader 5.0 or newer required to view drawings)

 

W-2        Fire Hydrant Assembly

W-3        Fire Hydrant Assembly with Grade-Lok Adapter

W-4        Fire Hydrant Locations / Clearance

W-5        Blow - Off Detail

W-6        Temporary Blow Off

W-7        Butterfly Valve Installation

W-8        Bacteria Sample Valve

W-9        Water Main Flushing Detail

W-11       3" or Larger Compound Meter and Backflow Preventer

W-12       Fire Line / Backflow Prevention

W-13       Valve Installation

W-14       Tapping Valve and Sleeve

W-15       Water Service Connection Detail

D-2        Water Details Sheet 2

C-2        Thrust Blocking Details

C-3        Thrust Restraining

C-4        Pipe Bedding

C-5        Trench Cross Section

C-6        Ductile Iron Transition Coupling

C-7        PVC Pressure Line Conflict Adjustment (Fittings)

C-8        Cross - Over Detail

C-9        Dip Pressure Line Conflict Adjustment MJ

C-10       Air Release Valve Automatic

C-11       Jack & Bore      

 

This Page updated 06-01-2004